Developing a comprehensive risk management document for high-voltage vehicle work is an essential part of any business owner or leader’s responsibility; the approach to risk management can indeed have dual interpretations—either seen as bureaucratic, or as a constructive framework to enhance knowledge and safety.
Here’s a structured outline for a risk assessment based on the context of Salvage Wire’s level 3 electric and hybrid vehicle training:
1. Identifying Risks
Begin by listing all potential hazards, such as:
- High Voltage Energy: e.g. Risk of electric shock or arc flash.
- Component Weight: Potential for muscular or skeletal injuries.
- Movement of Components or Vehicles: Risks related to shifting, lifting, or manoeuvring large, heavy objects.
- Others: Any environmental hazards, such as fire or chemical exposure.
2. Who Could Be Harmed
Consider all personnel who could be impacted, for example:
- Technicians: Risk from handling components or electrical shock.
- Other employees: who may be in the vicinity of these vehicles.
- Visitors/Contractors: Exposure to ongoing operations.
- Public: Potential exposure if incidents occur outside controlled areas.
3. Current Mitigations
Document the current safety protocols in place, which could be:
- Training and Certification: Ensure that employees have level 3 HV vehicle training and are certification.
- Tools and PPE: Availability and proper use of insulated tools, gloves, visors, and other required PPE.
- Standard Operating Procedures (SOPs): Follow either manufacturer SOPs or company-developed guidelines for handling or working on HV components and vehicles.
4. Risk Matrix: Likelihood vs. Consequence
Use a grid to assess the:
- Likelihood of Occurrence: From unlikely to highly probable.
- Consequence of Incident: Ranges from minor to catastrophic.
Example:
- Risk: Working on HV vehicle without training or PPE.
- Likelihood = High
- Consequence = Catastrophic
- Overall Risk = Unacceptable
5. Action Plan for Improvement
After identifying unacceptable risks, list steps to mitigate them which may include:
- Action: Train employees, enforce SOPs, provide necessary PPE.
- Responsible Person: Assign a team member or manager to oversee implementation.
- Deadline: Set a clear date for completion.
Then go back to the risk matrix and determine the overall risk – is it acceptable?
6. Review and Update Process
The document is dynamic and should be revisited periodically:
- Incident-based Review: Following any accidents or near misses.
- Scheduled Review: Quarterly, bi-annually, or annually depending on the nature of the risks.
- Component Changes: Reassess when new technology or components are introduced.
7. Document Archive
Retain older versions for reference to track progress and changes:
- File Versions: Save previous and current versions to maintain a clear historical record.
This framework allows organisations to proactively manage risks while fostering a positive culture of continuous learning and safety.
For more details about certified High Voltage training from Salvage Wire then please check out the training pages on the Salvage Wire website - https://www.salvagewire.com/training-courses and if you would like help to complete risk assessment documents then arrange your free 1 hour consultation at https://www.salvageinsight.co.uk